Customization: | Available |
---|---|
After-sales Service: | Provide |
Warranty: | 18 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
LDA model single girder overhead crane is a kind of light duty crane, with a capacity of 1 to 20 tons.
Capacity |
t |
3 |
5 |
10 |
16 |
20 |
||
Operational method |
|
Pendent line with press button /cabin/remote control |
||||||
Speed |
Hoisting |
m/min |
8. 8/0.8 |
7. 7/0.7 |
3.5, 3.5/0.35 |
6. 6/0.6 |
||
Travelling of crab |
20 |
|||||||
Travelling of crane |
Surface |
20(30) |
20 |
|||||
Cabin |
20(30) |
20 |
||||||
Electric hoist |
Type |
CD1-3 MD1-3 |
CD1-5 MD1-5 |
CD1-10 MD1-10 |
CD1-16 MD1-16 |
|
||
Lifting height |
m |
6,9,12 |
6,9,12,18 |
9,12 |
9,12 |
9,12 |
||
Working class |
|
A3~A5 |
||||||
Power supply |
|
3-phrase 50HZ 380V |
We have passed CE, GOST, SGS, and OHSAS & ISO9001:2000 international quality control, ISO14001:1996 environment and ISO9001:2001
health and safety certifications. We have a perfect quality-control system, a strict management system, and strong production
capability and advanced testing measures to ensure the high production and high quality.
Are you interested in this LX series single girder overhead crane?We are ready to quote for you according to your customizable paremeters as follows.(kindly please provide the following information when sending enquiry to us.)
1. Lifting capacity :_____ton
2. Span :______meters (it is center to center distance between railways)
3. Lifting height :_____meters (it is the distance from center of hook to floor)
4. Travelling length:_____meters
5. Industrial voltage _____V, _____HZ, 3Phases
6. Do you also need us to supply rail and bus bar: YES or NO?
7. What material to be lifted?