Customization: | Available |
---|---|
After-sales Service: | Provide |
Warranty: | 18 Years |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
200/50T Four Beams Bridge Foundry Crane with Cabin Control For Lift Ladle
1. The power supply of the crane is generally three-phase AC, frequency 50Hz, voltage 380 V. The upper limit of the voltage fluctuation allowed on the motor and electrical appliances is +10% of the rated voltage, the lower limit (when the spike current) is -15% of the rated voltage, of which the internal voltage loss of the crane, for the spindle release crane, clamp crane, the whole mould crane with guide frame and slab turning crane does not exceed 5%, and this for other types of cranes in this standard shall not exceed 4%.
If there are special requirements for the power supply, they can be determined according to the needs of the user by mutual agreement between supply and demand.
2. The altitude of the crane installation site should not exceed 2000m (over 1000m, the motor capacity should be calibrated according to the relevant provisions of GB755).
3. The working environment temperature and humidity of the crane
a. The working ambient temperature of the crane is generally -10~+50ºC.
b. The relative humidity shall not exceed 50% at a temperature of +40°C.
Lifting Capacity
|
125/32
|
140/32
|
160/32
|
180/50
|
200/50
|
225/65
|
240/80
|
280/80
|
320/80
|
Working Class
|
A7
|
||||||||
Span
|
19
|
19
|
27
|
28.5
|
28
|
27
|
22
|
22
|
24.5
|
Lifting Height
(Main Hook)
|
24
|
22
|
25
|
27
|
26
|
32
|
25
|
29
|
28
|
Lifting Height
(Auxiliary Hook)
|
26
|
24
|
26
|
29
|
26
|
34
|
27
|
29
|
33
|
Speed
(Main Hook)
|
7.6
|
7.8
|
9.8
|
7.5
|
6
|
11
|
7
|
12
|
7.5
|
Speed
(Auxiliary Hook)
|
9.7
|
9.7
|
12
|
10
|
10
|
11
|
9.6
|
10
|
10
|
Speed
(Main Trolley)
|
38
|
36
|
43.5
|
40
|
41
|
41
|
35
|
40
|
29
|
Speed
(Auxiliary Trolley)
|
39
|
37.5
|
43.5
|
38
|
38
|
39.5
|
38
|
40
|
39
|
Speed
(crane
|
76
|
73
|
84
|
80
|
78
|
84
|
80
|
80
|
58
|
Henan Mine Crane meet the demand factory, workshop, port, mining, waste disposal, goods scattered, petrochemical, aerospace and other industries of universal bridge crane, overhead crane price 20 ton 5ton, eot crane, door crane, universal gantry crane, rubber tyre and rail mounted container gantry crane, four link type portal crane, quayside container crane, crane, crane hook, mining grab crane, gantry crane, ship loader, grab bucket ship unloader, stacker reclaimer, dredger, mobile platforms and other types of hydraulic crane.