After-sales Service: | Online Service |
---|---|
Warranty: | 18 Months |
Certification: | CE, ISO9001 |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
5 Ton QZ Type Travelling Double Girder Overhead Crane System With Waste Grab
Two operating methods, namely, on floor and in the driver's cabin, have been designed for overhead crane with hook cap. The cabin is divided into open-style and closed style. The cabin can be installed on the left or right according to actual conditions The operator can enter the cabin from one side, rear or top, which depends on the different user's requirements.
It is composed with girder frame, crane travel device, and the trolley with lifting and moving device. There is pave the rail for the trolley moves on the main girder.
Assemble the moving table on the outside of the two main girder, one side is prepare for assemble and maintenance the crane move device, another side is prepare for assemble of the trolley conductor device.
There are full field of view cabin suspend under the main girder, there are joint control desk or single control box packed within the cabin, assemble the sidelong ladder between the cabin and moving table.
The main girder joint with the two side end carriage which with the joint point in the middle.
Electric System:
1. Control panel protection degree is IP54;
2. Reasonable components installation, convenient for check and maintenance;
Safety Protection Devices:
Overload limiter, limit switch, interlocking protection devices, buffer, track sweep plate, bus bar protection board, anti-collision device, main disconnecting switch, emergency stop system and motor overload protection.
Constitution:
The bridge: traverses on the runway;
The trolley: traverses on the bridge and lifts up and down;
The runway: tied to the building structure.
1) Simple structure in linear type ,easy in installation and maintation.
2) Adopting advanced world famous brand components in pneumatic parts ,electric parts and operation parts.
3) High pressure double crank to control the die opening and closing.
4) Running in a high automatization and intellectualization,no pollution
5) Apply a linker to connect with the air conveyor ,which can directly inline with filling machine.
Attention:
Safety is the most important issue for cranes. To ensure the safety,It is prohibited to use the equipment in the combustible, explosive or corrosives environment.(Need explosion proof type for this).Safety system:
1. All the cranes are equipped with overload protection device, Top quality long time bearing polyurethane materials buffer, Crane traveling limit switch, Voltage lower protection function, Emergency stop system and so on.
2. All operations are controlled by central control system. Excellent After Sales Service
3. The whole machines would be guaranteed for one year from the test run date.
4. Low charge for continue maintenance when warranty is expired.
Lifting Capacity | T | 5t | 10t | 16t | 20t | |
Span | m | 10.5-31.5m | ||||
Speed | Lifting | m/min | 40.1 | 40.7 | 41.8 | 48.6 |
Traveling of Trolley | 44.6 | 45.6 | 43.2 | |||
Traveling of Crane | 93.7/86.4 | 76/89 | 89/87.3 | 87.3 | ||
Operational Model | Cabin; remote control | |||||
Working Duty | A6 | |||||
Steel track recommended | 43kg/m or QU70 | |||||
Power Supply | Three-phase A.C. 380V, 50Hz |
Suppliers with verified business licenses