Customization: | Available |
---|---|
After-sales Service: | Include |
Warranty: | 18 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
5~74t Double girder remote control CCM workshop EOT crane is mainly used at the place where the molten metal is lifted, it is the main lifting and transportation equipment in the smelting workshop of the steel plant, and is used to lift and transfer and pour molten iron in the smelting process, he thermal-protective coating is added at the bottom of the main girder.
5~74t Double girder remote control CCM workshop EOT crane mainly consists of bridge frame, long traveling unit, hook and wirerope and lifting trolley, cable,cabin and electric control system,etc.
It has reasonable structure, robust , smooth running,soft starting low noise, low cost maintenance,long service life.
Normal capacity are 5t,10t,16t,16/3.2t,20/5t,32/5t,50/10t,74/20t,100/32t,125/32t,140/40t,160/50t,etc.
the span is 10.5~31.5m, lifting height 16-20m, working class is A7 or A8.
Control model: cabin control.
Ambient temperature normally up to 60ºC
1.Weight overload protection device,
2.Top quality long time bearing polyurethane materials buffer,
3.Crane traveling limit switch, Voltage lower protection function,
4.Emergency stop system,
5.Current overload protection system and so on!
Lifting weight(t) | 5 | 10 | 16/3.2 | 20/5 | 32/5 | 50/10 | 74/20 | |||||
Span(m) | 10.5~31.5 | |||||||||||
Max Lifting height(m) | 16 | 16 | Main hook | 16 | 12 | 16 | 12 | 22 | ||||
Auxiliary hook |
18 | 14 | 18 | 16 | 24 | |||||||
Working class | A6 | |||||||||||
Speed (m/min) |
Hoisting | 15.5 | 10.4 | Main | 10.7 | 9.8 | 7.8 | 7.8 | 6.1 | |||
Auxiliary | 14.6 | 15.5 | 15.5 | 10.4 | 9.7 | |||||||
Traveling of crab |
37.2 | 43.8 | 44.6 | 44.6 | 42.4 | 33.8 | ||||||
Traveling of trolley |
92. 7 93.7 |
92. 7 93.7 86.5 |
76/89 | 76/89 |
89 75.3 75.3 |
75/76.6 | 67.3 | |||||
Motor (type/kw) |
Hoisting | 15 | 22 | Main hook | 37 | 45 | 55 | 75 | 90 | |||
Auxiliary | 11 | 15 | 15 | 22 | 37 | |||||||
Traveling of crab |
1.5 | 2.2 | 3.7 | 3.7 | 7.5 | 11 | 15 | |||||
Traveling of trolley |
2*5.5 2*7.5 |
2*5.5 2*7.5 |
2*7.5/2*11 | 2*7.52*11 | 2*11 |
2*11 2*15 |
2*22 | |||||
Steel track recommended |
trolley | 18kg/m | 24kg/m | 43kg/m | ||||||||
crane | 43kg/m | 43kg/m or QU70 | QU70 | QU80 | QU100 | |||||||
Power source | 3P A.C 50Hz 380V |